SrNCategoryTitleRateNotesID
1Batching PlantPump and pipe line work on contract 90000/month;24 hrs working as when required. Approx team size of 5-6 Person.360
2Block/Brick/Plaster/Safety WorkGypsum Plaster without Material13/sqft;1124
3Block/Brick/Plaster/Safety WorkInternal Plaster80/sqm;2.5%Add 2.5 % per Floor from 1st Floor.1239
4Block/Brick/Plaster/Safety WorkInterlocking Paved Block Fixing10.22/sqft;Making footway by locking brick block. 110/sqm695
5Block/Brick/Plaster/Safety WorkPlaster-Kaccha 7/sqft;700
6Block/Brick/Plaster/Safety WorkSafety Net Fixing Internal 400/each;172
7Block/Brick/Plaster/Safety WorkBlock Work 100mm 12/sqft;Add 3% per Floor from 1st Floor.160
8Block/Brick/Plaster/Safety WorkSteel Shuttering and RCC Over Block 100mm100/rft;Laying reinforcement steel shuttering and RCC over Block work 161
9Block/Brick/Plaster/Safety WorkSteel Shuttering and RCC Over Block 200mm125/rft;162
10Block/Brick/Plaster/Safety WorkRed Brick Work 100mm12/sqft;Add 3% per Floor from 1st Floor.163
11Block/Brick/Plaster/Safety WorkRed Brick Work 230mm13/sqft;Add 3% per Floor from 1st Floor.165
12Block/Brick/Plaster/Safety WorkPlaster External Work (Single Coat)150/sqm;167
13Block/Brick/Plaster/Safety WorkSafety net fixing outer side to G+2 Duplex400/each;247
14Block/Brick/Plaster/Safety WorkSafety Work - Net Removing G+2 Side200/each;749
15Block/Brick/Plaster/Safety WorkPlaster - Extra Beam Groove 42/rmt;731
16Block/Brick/Plaster/Safety WorkPlaster - External Groove59/rmt;740
17Block/Brick/Plaster/Safety WorkBlock Work 200mm 13/sqft;Add 3% per Floor from 1st Floor.725
18Block/Brick/Plaster/Safety WorkTapak (balcony)6/ft;1103
19Block/Brick/Plaster/Safety WorkBlock/Brick/Plaster/Safety Work12/sqft;1104
20Casting N etcKitchen Complete Slab Upto Casting1000/each;Includes Shuttering , Reinforcement and Casting696
21Casting N etcLintel Fixing225/each;Used above Door and Window697
22Chipping/Core Cutting/RebaringRebaring, Steel 10mm70/Pc;Pc represent number of Steal.568
23Chipping/Core Cutting/RebaringRebaring, Steel 12mm105/pc;597
24Chipping/Core Cutting/RebaringRebaring, Steel 20mm255/pc;599
25Chipping/Core Cutting/RebaringCore Cutting in Beam and filing500/each;355
26Chipping/Core Cutting/RebaringCore cutting in RCC slab250/each;358
27Chipping/Core Cutting/RebaringRebaring, Steel 25mm310/pc;691
28Chipping/Core Cutting/RebaringRebaring, Steal 32mm860/pc;703
29Chipping/Core Cutting/RebaringCore Cutting800/each;714
30Chipping/Core Cutting/RebaringCore Filling40/each;For Pappu Rai, Rs 50/each.716
31Chipping/Core Cutting/RebaringKutch Cutting17/rmt;250
32Chipping/Core Cutting/RebaringBeam Cutting up to 25mm thick130/sqm;251
33Chipping/Core Cutting/RebaringHacking RCC Column And Shear Wall5/sqm;252
34Chipping/Core Cutting/RebaringWater Proofing165/sqm;Water proffing Tapecreat as per standard specification including protecting coat af plaster including pipe plaster 259
35Chipping/Core Cutting/RebaringBeam Core Cutting (185x200 mm)550/each;775
36Chipping/Core Cutting/RebaringRebaring, Steal 16mm190/each;751
37Chipping/Core Cutting/RebaringRebaring, Steal 8mm40/pc;769
38Chipping/Core Cutting/RebaringCore cutting in Beam for AC400/each;1282
39ElectricalRo Fitting250/each;888
40ElectricalTesting & handover2000/flat;For T-05 & 06 Only1116
41ElectricalEarthing Cable20/mt;1117
42ElectricalBasement electrical conduit with wiring9.5/mt;1118
43ElectricalElectrical panel box complete work3000/each;1119
44ElectricalOutside Flat. Shaft and Panel Room37500/each;Electrical Work of each Flat in electrical shaft and panel rooms (outside Flat) 1120
45ElectricalLift Complete electrical work10000/each;1121
46ElectricalLED Bulb Fixing50/each;745
47ElectricalGeyser Fitting280/each;841
48ElectricalWindow ac fitting350/each;842
49ElectricalSplit ac fitting1000/each;843
50ElectricalFAN FITTING90/Each;436
51ElectricalDB Fixing500/each;113
52ElectricalSlab Conduiting 3/sqft;174
53ElectricalConduit down opening and fish wire 5% of Rs 150.75/sqft;175
54ElectricalWall Conduiting 25% of Rs 153.75/sqft;178
55ElectricalWireing 25% of Rs 153.75/sqft;179
56ElectricalSwitch and Socket Fixing 20% of Rs 153/sqft;181
57ElectricalTesting Hand Over 5% of Rs 150.75/sqft;183
58Fabrication WorkSteel Cutting with Gas Cylender 7/kg;699
59Fabrication WorkChair Making for Plaster and Paint5/kg;709
60Fabrication WorkChair Repairing 50/each;710
61Fabrication WorkRailing Making12/kg;195
62Fabrication WorkMS Railing Repair (not in size & shape)200/each;196
63Fabrication WorkRefixing of existing railing including fasterner200/each;Removing Repairing refixing of existing fixed railing including fixing of fasterner after making fixing M.S cleat197
64Fabrication WorkFixing MS Pipes and GI Sheet for Hutment13/sqft;Febrication and fixing M.S pipes and Gi sheet for hutment both horizontal and vertical shall be measured 198
65Fabrication WorkPIN Patti Making 15/kg;242
66Fabrication WorkChali Making12/kg;245
67Fabrication WorkColumn Framing10/kg;116
68Fabrication WorkStair Case Railing500/rmt;!0% Add on for T1118
69Fabrication WorkHand Railing Work200/each;123
70Fabrication WorkCutting, Welding and fixing Steel Mesh in Shaft6/kg;Cutting welding and fixing steel mesh in shaft including welding rod at all height 345
71Fabrication WorkShaft Steel Mesh Making 200/each;755
72Fabrication WorkISMB Fixing Two Lifts in Tower5000;For Both Lift885
73Fabrication WorkProp Jack Repair20/each;1095
74Fabrication WorkChair (Ghori) making100/each;1096
75Fabrication WorkSteel bar cutting all dia4/Each;1097
76Fabrication WorkMS Fixing work4/Kg;1098
77Fabrication WorkKenda making10/each;1099
78Fabrication WorkRemoving MS pipe & GI sheet10/sqft;1100
79Fabrication WorkFixing flanges in OHWT100/each;1101
80Fabrication WorkChannel Making 8/kg;726
81Fabrication WorkCounter Angle Making & Fixing50/each;717
82Fabrication WorkMS Gate Fixing700/each;789
83Fabrication WorkRailing Fixing All Sizes115/rmt;945
84False CeilingGrid False Ceiling Without Material Fixed535/Toilet;1123
85False CeilingGrid False Ceiling with Material50/sqft;690
86False CeilingGypsum Plaster30/sqft;741
87False CeilingGrid False Ceiling Without Material10/sqft;727
88False CeilingGrid False ceiling650/Toilet;Labour Rate with no security deduction 1102
89Fire / Water ProofingTapecrete Water Proofing Work181.5/sqft;Rate modified before881
90Fire / Water ProofingBrick Bat Coba25/sqft;After water proofing on roof. We place piece of brick and then do Plaster.882
91Fire / Water ProofingInjection Nipple Grouting150/each;742
92MISCExcavation Depth 3100mm2.15/cft;730
93MISCOpening Raft 3000/mt;886
94PaintingWall Primer1.25/sqft;772
95PaintingWall Paint1.25/sqft;773
96PaintingWodden Door Putty 1/sqft;719
97PaintingWodden Door Paint1.5/sqft;887
98PaintingWooden door Shutter Polish16/sqft;1105
99PaintingMS Railing Primer 1 Coat1/sqft;1106
100PaintingMS Railing Paint 1 Coat1.5/sqft;1107
101PaintingExternal Primer 1 Coat1.4/sqft;1108
102PaintingExternal Paint 1 Coat1.2/sqft;1109
103PaintingLaying Wall Putty1.25/sqft;Initially Rs 1/sqft365
104PlumbingToilet PVC Fitting 30% of 40001200/each;761
105PlumbingToilet Water Supply Riser UPVC 10% of 4000400/each;762
106PlumbingSink Fixing400/each;756
107PlumbingTerrace Valve Ball 120/each;757
108PlumbingTerrace Valve Ball 80/each;758
109PlumbingTesting Toilet CPVC 10% of 4000400/each;759
110PlumbingCPVC Work in Toilet 20% of 4000800/each;777
111PlumbingPVC Internal and External in Kitchen 30% of 2000600/each;783
112PlumbingKitchen CPVC Fitting Testing200/each;785
113PlumbingCPVC in Kitchen 20% of 2000400/each;786
114PlumbingUPVC Kitchen Water Supply Riser 10% of 2000200/each;787
115PlumbingCPVC ReWork with Dismanteling of Toilet n Kitchen2000/each;794
116PlumbingRing Line Terrace Floor 90/rmt;752
117PlumbingLaying sewarge line RCC pipe 250mm 220/rmt;1112
118PlumbingGI pipe fitting 50mm100/mt;1113
119PlumbingPVC pipe 110mm100/mt;1114
120PlumbingPVC pipe 160mm150/mt;1115
121PlumbingChinaware Fitting Kitchen 30% of 2000600/each;711
122PlumbingChinaware Fitting Bathroom 30% of 40001200/each;712
123PlumbingUPVC Pipe Boring to UG Tamprary Tank 32mm20/each;702
124PlumbingRCC Pipe Sewarage 250mm Dia220/rmt;698
125PlumbingFixing of PRV500/each;348
126PlumbingTerrace Ring 100mm DIA140/rmt;349
127PlumbingTerrace Ring 80mm DIA120/rmt;350
128PlumbingTerrace Ring 65mm DIA115/rmt;352
129PlumbingTerrace Ring 40 to 50mm DIA100/rmt;354
130ReinforcementReinforcement6000/mt;438
131ReinforcementReinforcement for Column6000/mt;3% Lift Charge from Ground Floor439
132ReinforcementReinforcement for Slab6000/mt;3% Lift Charge from Ground Floor925
133ScaffoldingScaffolding Fixing and Removing 19/sqm;168
134ScaffoldingScaffolding Tappa With chali fixing 75/one tappa;171
135Scaffolding DE Scaffolding7/sqm;477
136ScaffoldingScaffolding Fixing Only 12/sqm;693
137ScaffoldingOuter scaffolding + descaffolding22/sqm;1089
138ScaffoldingOuter scaffolding13/sqm;1090
139ScaffoldingOuter descaffolding9/sqm;1091
140ShutteringShuttering For Column110/sqm;2.5% Lift Charge from Ground Floor, Rs 10 Incentive on target base924
141ShutteringShuttering for Basement/NTA Slab150/sqm;Rs 10 Incentive on target base370
142ShutteringShuttering for Typical Slab110/sqm;2.5% Lift Charge from Ground Floor; Rs 10 Incentive on target base371
143ShutteringShuttering making 40/sqm;372
144ShutteringShuttering RE making50/sqm;374
145Tiles/Granite/StonesStair Case (Granite)28/sqft;187
146Tiles/Granite/StonesCorridor (Granite)29/sqft;2.5%188
147Tiles/Granite/StonesSkirting (Granite)24/rft;2.5%189
148Tiles/Granite/StonesChemfering Single Edge11/rft;190
149Tiles/Granite/StonesFixing Wall Tiles16/sqft;2.5%191
150Tiles/Granite/StonesFixing Floor Tiles15/sqft;2.5%192
151Tiles/Granite/StonesKitchen Counter (Granite)37/sqft;2.5%193
152Tiles/Granite/StonesSkirting (Tiles)10/rft;2.5%194
153Tiles/Granite/StonesCladding in Lift60/sqft;713
154Tiles/Granite/StonesDoor Seal24/rft;2.5%Just below door. Also known as Dahal. Initially Rs 22.729
155Tiles/Granite/StonesToilet Basin Counter Without Hole200/each;Two Holes in Granite. Each Rs 100. Initially included.760
156Tiles/Granite/StonesStaircase Tread & Riser29/rft;1092
157Tiles/Granite/StonesTiles/Granite/Stone12/sqft;1093
158Tiles/Granite/StonesTiles/Granite/Stone29/sqft;2.5%1094
159Tiles/Granite/StonesKitchen Counter Latak 26/ft;2.5%1110
160Tiles/Granite/StonesLift Electrical box granite cutting125/each;1111
161Wooden/UPVC WorkDoor Fitting600/door;Rs 20 Extra for shifting door to flat.480
162Wooden/UPVC WorkDoor Frame300/each;Door Frame Fixing482
163Wooden/UPVC WorkDoor Shutter Repair50/door;483
164Wooden/UPVC WorkUPVC Door and Window Fitting290/sqft;763
165Wooden/UPVC WorkDoor Moulding3/rft;718
166Wooden/UPVC WorkDoor Shutter Fixing Work 500/each;721